External quality control in the construction of the accumulation of the Brežice hydroelectric power station with a high-water pressure relief

 

Our role: External quality control - Project manager

Year of the design of technical documentation: 2015 - 2018

 


As a leading partner together with our partners ZAG and ZRMK (joint venture), we carried out external quality control in 2015 - 2018 for the construction of the accumulation basin of the Brežice HPP and the associated high-water pressure relief. The external quality control monitored the progress of the construction works throughout the implementation and verified the success of the works on an ongoing basis. It provided its expertise to assist the contractor in resolving any problems and irregularities that arose.


HydrogeologyIrena Oberauner