IRGO Consulting d. o. o.
Slovenščina Home Home
English E-mail E-mail
Srpski Sitemap Sitemap
Hrvatski
Phone: +386 1 560 36 00
E-mail: info@irgo.si

Extension of Inter-Municipal Landfill for Communal Waste Unično, Stage 2

PrintRecommend us
Investor:
The Municipality of Hrastnik
Stage:
PGD, PZI, PID
Client:
The Municipality of Hrastnik
Elab. of project doc.:
2002-2004
Designed by:
IRGO CONSULTING d. o. o.
Project manager:
Marjeta Vrančič, BSc, univ. graduate engineer of mining and geotechnology
Project No:
ic 152/02, ic 535/02

Description of Project

The municipalities of Zasavje have signed the intermunicipal agreement on construction and operation of a waste management intermunicipal centre at Unično. In the framework of this agreement, a project for extension of the intermunicipal landfill for communal waste Unično, stage 2, was elaborated. The project embraced the finalization of stage 1 and transition to stage 2, determination of deadlines of all stages, and design concept for extending the landfill in stage 3, design of a purification plant, design of forced degasification and design of the electric power supply.

Technical Features

Landfill capacity is 160,000 m3.

Cooperating Designers and Design & Engineering Organizations

IBE Ljubljana, Hidroinženiring Ljubljana, Sinet Hrastnik

Legend:
IDZ – design concept
IDP – conceptual design
PGD – design for obtaining Construction Permit
PZI – detailed design for implementation
PZR – design for tender documents
PID – as-built design

Pošljite nam povpraševanje

Image material

Pogled na urejeno novo odlagalno polje UničnoPlinjaki na deponiji UničnoOtvoritev medobčinske deponije komunalnih odpadkov Unično, 2. faza


« back
« back to the list
News
 

This web page does not use cookies to track the users.